Published July 18, 2024
The City of Spring Valley is pleased to announce that effective August 1, 2024, it will partner with SAFEbuilt to provide our community with Building Department Services. The city will work closely with SAFEbulit on implementing Community Connect, an online portal for homeowners and contractors to submit applications and pay for permits online, check application status, and receive electronic inspection results. SAFEbuilt will also offer remote video inspections for some types of inspections to help meet your scheduling needs. During this transition, questions related to Building Permit applications, the Minnesota State Building Code, and scheduling inspections may be directed to SAFEbuilt at 952-442-7520.
Frequently Asked Questions (FAQ’s)
/////
Why does the City of Spring Valley require Building Permits?
Once a community in Minnesota reaches a population of 2500 residents, the state requires that the MN State Building Code be adopted. Spring Valley’s official population was recently revised to 2470 residents; therefore, the City of Spring Valley has proactively adopted the State of MN Building Code. The Minnesota State Building Code can be viewed FOR FREE at www.iccsafe.org
Doesn’t Spring Valley already require Building Permits?
No, currently, Spring Valley requires a Zoning Permit for all projects. A Zoning Permit is separate but still required. A Zoning Permit application is part of the Building Permit application process. Zoning Permit Applications can be obtained at City Hall, completed, and submitted with a $25.00 Administrative Fee.
Does my project require a Building Permit?
According to the State of Minnesota Building Codes, various projects require permits. The requirements can be viewed at https://www.revisor.mn.gov/rules/1300.0120/
What is a Project Plan Review?
A Project Plan Review is the process of reviewing the applicant’s construction documents for compliance with the City of Spring Valley Planning and Zoning ordinances and the Minnesota State Building Codes.
How long do Project Plan Reviews take?
Commercial Plan Reviews for a new construction typically take between ten (10) to fifteen (15) business days.
Residential Plan Reviews for a new construction typically take between five (5) to ten (10) business days.
Projects not requiring a Plan Review are considered “Over the Counter” or (OTC) permits. These typically take about five (5) business days.
How much do Building Permits cost?
Building Permit fees vary depending on the project. A complete fee schedule can be viewed at: https://springvalleyeda.org/wp-content/uploads/2024/07/Spring-Valley-MN-Building-Permits-Fee-Schedule.pdf
How quickly can an inspection be scheduled with SAFEbuilt?
Depending on the project, different inspections must take place at various points (footings, framing, plumbing, HVAC, electrical, etc.). Scheduled inspections are typically conducted within 24 to 48 hours.
Are there any required inspections not performed by SAFEbuilt?
Yes. The State Electrical Inspections are conducted by the State of Minnesota, NOT SAFEbuilt. For more information regarding State Electrical Inspection, go to http://www.dli.mn.gov/business/get-licenses-and-permits/permits
When will I receive the result of my inspection?
Inspection results will be available the day the inspection is completed via the physical inspection report (onsite permit card), online portal, or email.
Am I required to use a licensed contractor for my project?
No, however, you will be responsible for any work performed. Choosing not to use a licensed contractor eliminates your claim to any recovery funds. Most importantly, you are still responsible for all inspections required by the Minnesota State Statute and Minnesota State Building Codes.
What if I have an emergency repair (storm damage, waterline leak, sewage backup)?
Address the emergency repair immediately; the applicant then has 24 hours to apply for a permit for the needed repairs.
For additional questions related to Building Permit applications, the Minnesota State Building Code, and scheduling inspections please contact SAFEbuilt at 952-442-7520, Spring Valley City Hall at 507-346-7367, ext-1.